Project Overview

Part of the Woolgoolga to Ballina Pacific Highway Upgrade

 

Funded by both the Australian and New South Wales Governments, the Bridge over Clarence River at Harwood is a part of the $4.6 billion Woolgoolga to Ballina Pacific Highway Upgrade.

As part of the Acciona Ferrovial Joint Venture, Acciona Infrastructure has been engaged to design and build this 1.5km bridge featuring 13 piers over the river, 144 concrete girders, and 23 piers on land.

The main goals for this project are to reduce travel time, improve road safety, and increase transport efficiency.

For further information on this project, please visit the Roads and Maritime Services website:

MORE INFO

Project Details

LOCATION

Harwood, NSW

PRINCIPLE CONTRACTOR

Acciona Infrastructure

EST. COMPLETION

December 2019

OVERALL VALUE

$4.36 Billion

CONTRACT VALUE

$440,000

Hawthorne Civil Component

  • Formwork and concrete crews assisted in the construction of collumns and headstocks on the marine section of this project
  • Works were constructed from two barges positioned on the Clarence River
  • We maintained a high level of safety and environmental awareness with zero MTIs or LTIs to date

 